Recurrent Energy is developing the Beacon Storage Project, a battery energy storage system (BESS) facility located in Prince George’s County, Maryland. The project is anticipated to provide up to 800 megawatt hours (MWh) of storage capacity.
Recurrent Energy is developing the Beacon Storage Project, a battery energy storage system (BESS) facility located in Prince George’s County, Maryland. The project is anticipated to provide up to 800 megawatt hours (MWh) of storage capacity.
Location | Prince George’s County, Maryland |
Project Capacity | Up to 200 MWac / 800 MWh |
Targeted Operation Date | 2029 |
Acreage | 23 acres |
Interconnection | new substation on the Chalk Point to Oak Grove 230 kV transmission line |
Earliest Construction Start Date | 2028 |
Large-scale energy storage is the method and apparatus used to store energy within an electrical power grid. The electrical energy is stored during the day when there is an abundance of electricity being generated, and it is discharged during peak hours when the need is greatest. Advances in technology and materials, paired with economies of scale, have led to dramatically reduced costs associated with energy storage.
BESS improve the way that we generate, deliver, and consume energy, providing many benefits:
BESS have individual battery cells, which are electrically connected and then packaged in a battery module. The battery modules are aggregated with controls and other equipment within racks, which are housed within enclosures, such as a cabinet, ISO shipping container, or a building.
These systems operate by converting electricity from the grid or a power generation source into stored energy. This will allow us to charge and discharge from the battery storage project when there is a demand.
A BESS has no direct emissions, requires no pipelines, recycles electricity, and helps to cut emissions by taking the load off traditional generation sources. Energy storage has been a part of our electrical grid since the 1930s and has a safety record that is similar to or better than other electricity generation, distribution, or management methods.
Recurrent develops robust emergency response plans, based on industry best practices that are customized for each facility. These emergency response plans include extensive collaboration with first responders to address emergency situations that might be encountered as well as the proper safety responses for each situation. Emergency response plans also include contact details for subject-matter experts who can advise first responders on appropriate actions for each situation.
In addition, we comply with the safety measures required by the Federal Regulatory Energy Commission, the North American Electric Reliability Corporation, and applicable regional and local laws. We are also bound by the International Building Code, the International Fire Code, National Fire Protection Association codes and standards, and state fire regulations.
Safety events that result in fires or explosions are rare. The US energy storage industry has prioritized the deployment of safety measures such as emergency ventilation to reduce the buildup of flammable gases. Because ventilation can reduce the effectiveness of fire suppression, the industry is adopting the strategy of allowing fires in individual battery enclosures to burn out in a controlled manner. By preventing the propagation of fire between enclosures, the isolated fire consumes any flammable gases as they are produced, thus preventing explosions and avoiding problems with stranded energy and reignition, both of which have been issues with electric vehicle fires. The 24/7 monitoring systems of BESS containers include gas detection and monitoring to indicate potential risks. As the energy storage industry reduces risk and continues to enhance safety, industry members are working with first responders to ensure that fire safety training includes protocols that avoid explosion risk.
Prior to operation, we will develop an emergency response plan in accordance with industry best practices, which will outline the response procedures to be employed should an emergency arise at the project site. We will work closely and collaborate with the local departments and authorities when developing the emergency action plan and setting up fire road access.
We provide pre-construction training to all emergency response personnel, which includes a description of the project, any potential construction risks, and the role of emergency responders should an incident occur. After construction is complete, we will host the emergency response personnel for a site visit to make sure they are familiar with the system and our Emergency Action Plan.
The batteries themselves do not make any noise. Unlike other power infrastructure or generation facilities, BESS have very low noise profiles, with fans, HVAC systems, and transformers producing sounds at similar levels to standard commercial buildings.
BESS can be housed in a variety of enclosures or buildings. The typical enclosure looks like a shipping container. BESS are often unmanned and do not need light to function. Some may have lighting for security purposes, and this would be consistent with normal streetlighting.
BESS must comply with electrical and fire codes adopted at the state and local level. BESS owners must submit documentation on system certification, fire safety test results, hazard mitigation, and emergency response plans to the local Authority Having Jurisdiction for approval. Before operation, facility staff and emergency responders must be trained in safety procedures and are required to be given annual refresher training.
To learn more, refer to American Clean Power’s BESS Codes and Standards Overview. The U.S. storage industry has continuously supported the development of codes, standards, and best practices to promote safety.
BESS can last for 20 years or more. Battery degradation is based on various factors such as chemical composition, the number of charge and discharge cycles, and the temperature of the environment that the batteries are exposed to.
The US lithium-ion battery recycling industry is growing rapidly to accommodate batteries from both electric vehicles and BESS. Companies are moving beyond simple recovery of raw materials and into direct recycling of electrode materials that can be built sustainably and cost-effectively into new batteries. BESS provide the opportunity to repurpose batteries from end-of-life electric vehicles, extracting maximum usage for the benefit of consumers.
Project Phone: (240) 280-0399
Project Email: [email protected]