Recurrent Energy is developing the Saluki Power Project, a 135 megawatt (MW) solar photovoltaic power facility located in Saline County, IL, west of Galatia. The project is expected to start construction in late 2027, with commercial operation expected in 2029.
Location | Saline County, Illinois |
Project Capacity | 135 MW/ 540 MWh |
Homes Powered | Approximately 23,000 homes annually |
Targeted Operation Date | 2029 |
Acreage | Concept Plan in progress; fenced facility estimated between 1,000 – 1,200 acres |
Est. Jobs Created | Approximately 200-250 jobs during peak construction. Please see economic impact analysis |
Solar projects provide numerous benefits to the communities in which they are sited. Solar projects represent significant local investments and drive meaningful increases in the local taxable property base. Solar projects also provide guaranteed annual property tax payments to local taxing jurisdictions, which allow county and local officials to make long-term financial plans and increase spending on public services and other critically important infrastructure.
Large-scale solar projects, such as the Saluki Power Project, provide a diversified revenue stream to landowners that protects against fluctuating agricultural commodity prices and preserves family properties for future generations. In addition, these projects directly create hundreds of full-time equivalent jobs during the construction and installation phases and support indirect and induced jobs during development and construction.
Please see the link to the Economic Impact Analysis for more information.
While producing electricity with photovoltaics emits no pollution, produces no greenhouse gas emissions, and uses no finite fossil fuel resources, it has been argued that solar power has a hidden carbon footprint due to solar panel manufacturing and project construction. Both fossil fuel and non-fossil fuel power technologies induce life-cycle greenhouse emissions that stem from the energy requirements for their construction and operation. Known as a “carbon debt,” this debt of energy must be paid off to calculate how solar projects reduce emissions over their lifetime. A typical utility-scale solar project—like the Saluki Power Project—repays its carbon debt in roughly 12 months or less, providing decades of zero emission energy.
Yes, the Saluki Power Project will develop an Agricultural Impact Mitigation Plan in accordance with requirements from the Illinois Department of Agriculture.
Solar projects are low impact and coexist well with agriculture, operating without any impact to adjacent agricultural properties. A solar project’s lifespan allows the soil in the project area to rest and replenish nutrients. Native vegetation can grow under the panels, allowing the land to retain water and topsoil, improving soil health over time. After decommissioning occurs at the end of the Project’s life, the land can revert to its previous agricultural use.
The Saluki Power Project will use construction methods that minimize large-scale grading and removal of native soil. Minor grading may be needed, but we take the conservation of topsoil very seriously. Typical construction practices require that topsoil be stripped and preserved onsite prior to performing cut/fill operations. The preserved topsoil will be redistributed across the graded areas to assist in growing adequate ground cover as quickly as possible to provide ground stabilization. The site cut and fill will be appropriately balanced where practicable, to avoid or minimize import/export of fill.
Examining property values across the United States demonstrates that large-scale solar projects like the Saluki Power Project have no measurable impact on the value of the adjacent properties, and in some cases, may even have positive effects. Studies also show that proximity to solar projects does not deter the sales of agricultural or residential land.
When sited and developed properly, the installation of the solar facility will have minimal impacts on wildlife in the area. In fact, studies show that solar facilities can provide shelter for species, promote land stability, preserve habitat, and support biodiversity.
Natural resource assessments are being conducted on the Saluki Power Project site to determine presence, if any, of federally- or state-listed species and critical habitat. The results of the assessments will be shared with state and federal regulatory agencies and consultation will be conducted as needed.
Once constructed, solar projects produce no pollution, emissions, nor significant noise. Further, vegetation will grow under the panels to stabilize and promote soil health. Limited fencing will be erected around panel areas as a security measure in accordance with industry best practices and local requirements. However, most forested waterways in the project area will not be fenced to allow continued wildlife access to the water resource and the wildlife corridor it provides.
A wetland delineation was performed on the Saluki Power Project site and the project layout will be designed to avoid impacts to jurisdictional streams and wetlands to the extent possible. Some minor crossings of waterways may be required for access roads or underground medium voltage collection lines. Any permit requirements will be coordinated through the U.S. Army Corps of Engineers, Illinois Department of Natural Resources, and Illinois Environmental Protection Agency. The project is also implementing a stormwater pollution prevention plan which includes Best Management Practices designed to avoid impacts to surface water quality.
The Saluki Power Project will use a solar panel tracking system, allowing the panel cells to align with the sun as it moves across the sky. Therefore, due to continuous tilt, water will not collect on the panels during rainstorms. The rainwater that runs off the panels is absorbed into the ground, nurturing vegetation located under the panels. All stormwater on the site will be managed by a stormwater management system, which will be protective of local water quality.
Solar power is now one of the cheapest sources of new electricity in most of the world due to declining equipment costs, improved technologies, and public policies that support the generation and use of renewable energy.
In the last decade, the cost to install solar has dropped by more than 40%. According to Lazard’s Levelized Cost of Energy Analysis – Version 17.0 (2024), even without tax credits, new solar resources have a levelized cost of energy in the range of 2.9¢/kilowatt (kW) hour – 9.2¢/kW hour for large-scale solar. This range falls below the levelized cost of energy for new coal or gas combined cycle power production. These results have been bolstered by the International Energy Agency’s World Energy Outlook 2023, which found that “Solar PV and wind are now the cheapest sources of electricity in most markets.”
Adding to their growing appeal, solar projects are uniquely able to sell their electricity output at a fixed price over the life of the project because the “fuel” is free and not subject to increases in commodity fuel prices.
Yes. Because the photovoltaic (PV) panel materials are enclosed and do not mix with water or vaporize into the air, there is little-to-no risk of chemicals, including greenhouse gases, being released into the environment during normal use. Crystalline silicon PV panels, which are extremely common and used worldwide do not pose a material risk of toxicity to public health and safety.
All solar facilities are designed to strict electrical safety standards to ensure safe operation. Product safety standards, installation requirements, and building codes for solar facilities are addressed by the National Fire Protection Agency’s National Electric code, the International Code Council’s International Fire Code, the International Association of Firefighters, and several other safety product and standards groups.
The Saluki Power Project will be designed in accordance with Illinois Department of Transportation regulations as well as best practices. Signage and flagging will be implemented during construction as required. After construction is complete, the daily traffic will be reduced to one or two standard-size vehicles. County road use will also be coordinated with Saline County and local townships, as applicable, under a Road Use Agreement.
Glint refers to the direct reflection of the sun on a solar panel. Glare is a continuing source of brightness, not the direct reflection of the sun. Solar arrays are designed to absorb light and produce electricity, not reflect it. The panels that we will use for the Saluki Power Project have an anti-reflective coating, which helps to increase the amount of light absorbed into the cell, thereby increasing efficiency and reducing glare and allowing the panels to blend in more easily with the surrounding area.
The National Electric Code requires secure fencing to restrict access to the site, as well as appropriate levels of warning on all electrical components. The Saluki Power Project will be surrounded by a fence at least six feet in height, with three strands of barbed wire on top as an added protection measure.
The Saluki Power Project will be monitored during operating hours by onsite staff. The entire property will also be monitored remotely 24 hours a day, 7 days a week.
We anticipate that the Saluki Power Project will have a construction timeline of approximately one year. Construction will typically occur during daylight hours Monday-Friday, and some work may occur on Saturdays. We do not anticipate construction activities taking place on Sundays or major holidays.
Using concrete for steel pile installation is not preferred since it is more time consuming and costly. However, sometimes alternative foundation designs such as concrete are needed to mitigate soil/rock conditions. The EPC will complete advanced geotechnical studies to determine if there are any locations that may require special construction methods or equipment. Areas with challenging conditions and pile drivability issues can be addressed by using alternative designs such as pre-drilled piles, helical piles, or concrete foundations. There will be limited amounts of concrete for inverter pads and at the substation.
The Saluki Power Solar Project will follow Saline County requirements for a weed/grass control plan, which will be submitted with its application for a Solar Farms Construction Permit. Maintenance crews will maintain the perimeter and landscaping within the project boundaries. The interior ground cover shall not exceed 18 inches, with a typical maximum height of 12 inches, so that it doesn’t interfere with the panels or other electrical components.
Due to the average amount of rainfall Saline County normally experiences, we do not anticipate regularly scheduled washing of the panels. However, if washing is required, locally sourced water will be used to clean the modules.
The Saline County Ordinance requires that the Saluki Power Project submit a detailed decommissioning plan and cost estimate with its application for a Solar Farms Construction Permit. The decommissioning plan will describe how facilities will be removed at the end of the project’s lifespan. Decommissioning will include removal of all non-utility-owned above ground equipment, including the solar panels, racking, transformers, inverters, conduit stub outs, or other above ground structures including foundations. At the end of the project’s operational life, the land can be returned to its prior condition and use.
The Saluki Power Project is required by the Saline County Ordinance and Illinois Department of Agriculture Agricultural Impact Mitigation Agreement to post financial security to cover the cost of decommissioning at the end of the Project’s life. This financial assurance must be in place before the facility is operational and is updated at routine intervals throughout the project’s lifespan.
Yes, PV panels typically consist of glass, aluminum, copper, silver and semiconductor materials than can be successfully recovered and reused at the end of their useful life. Alternatively, solar PV components can be reused or refurbished to have a “second life” of generating electricity.
Contact Us at [email protected]