(PV Magazine) – The Bayou Galion solar project is expected to reach commercial operations in 2024 and is part of a larger portfolio set to bring 343 MW of solar energy to the state, which has seen just over 200 MW installed thus far.
Recurrent Energy Energizes 1,200 MWh Storage Facility in Arizona Ahead of Peak Summer Demand
First of three projects with APS now in operation, delivering flexible capacity to the grid KITCHENER, ON, JULY 7, 2025 – Recurrent Energy, a subsidiary